September 2009 Photo's of RailRoad Progress

September 5th the last two switches for Sanford Yard are assembled and placed into position. This completes the yard.

 

September 19, today we did some switch maintainence and ballasted Sanford Yard.
The yard is now 95% ballasted as we reached the bottom of the ballast pile. These photos show the results
This photo is of one of our usually un-seen members milling switch points in his shop.

 

September 26, two new light fixtures were assembled for the train station area. Also, the lights in the yard received more permanent wiring.
These photos show the setting and cementing of a maintenance rack. This could be also used as a additional steaming bay.
These photos show the installation of the two new lights in the Station area.
And finally, a picture of a member rarely seen in our photos. The reason, he is the one that takes the pictures and maintains the web site.

 

 

 