December 2009 Photo's of RailRoad Progress

 

Here is a photo of an elf driving a train during our "Train to the North Pole" run.
Special thanks to John Gilliss of Friendly Kia for providing transportation during the event.

 

Saturday, December 26th. This series of photos show the lead to the steaming bays getting installed. Foundation, track laid, connected, then leveled.
Here the track for the hydraulic lift is being secured to the concrete foundation.
This work is being done in anticipation of the lift is to be delivered this week.
This photo shows the club engine on the maintenance rack for some much needed work. Engine and hydraulic tune-up is called for.

 

 

 